![8.15m Tunnel Boring Machine 'Annie' passing through ventilation shaft during 7.5km excavation on the Channel Tunnel Rail Link Stock Photo - Alamy 8.15m Tunnel Boring Machine 'Annie' passing through ventilation shaft during 7.5km excavation on the Channel Tunnel Rail Link Stock Photo - Alamy](https://c8.alamy.com/comp/B8J3HW/815m-tunnel-boring-machine-annie-passing-through-ventilation-shaft-B8J3HW.jpg)
8.15m Tunnel Boring Machine 'Annie' passing through ventilation shaft during 7.5km excavation on the Channel Tunnel Rail Link Stock Photo - Alamy
tunnel.engineering - Drive shaft at TTSM project in London. Caisson Sinking method was used for construction of the shaft. Excavation of the shaft started with an excavator inside the shaft and jacks
City Rail Link - Here's how the excavation of the temporary access shaft at Mercury Lane is looking today. It's part of the #linkAlliance construction preparation for the #crl #cityraillink Karangahape station.
![Excavation of a large diameter drilled shaft (photo courtesy by Ulrich... | Download Scientific Diagram Excavation of a large diameter drilled shaft (photo courtesy by Ulrich... | Download Scientific Diagram](https://www.researchgate.net/publication/241727342/figure/fig1/AS:458823182884865@1486403380068/Excavation-of-a-large-diameter-drilled-shaft-photo-courtesy-by-Ulrich-Hegg-Eng-MSc.png)